Digital workflow systems

Software that makes technical companies easier to run.

Ultimatik Network builds project management software, production dashboards, offer and drawing tools, reporting systems and custom web applications for companies where sales, engineering, procurement, workshop, delivery and management must work from the same truth.

Fewer blind spotslive statuses, tasks and responsibilities
Cleaner decisionsreports, deadlines and project history
Built for realitycustom modules around your process
Futuristic workflow dashboard with projects, production statuses and mobile overview
Real-time overviewprojects, tasks and departments
From office to workshopdesktop, tablet and phone

The operational problem

Most companies do not need more documents. They need one reliable flow of information.

Spreadsheets, email threads, paper notes and disconnected apps can survive when the team is small. They become expensive when projects, materials, deadlines, production tasks and customer promises start moving at the same time.

Messy document stack and warning signals representing scattered project information
Before

Information is scattered across files, messages and memory.

People waste time asking for updates, checking old notes, searching for the latest version and guessing who is responsible for the next step.

Clean dashboard and phone view showing instant project information
After

Every important status is available instantly, even from a phone.

Projects, work orders, procurement, planning, production, delivery, payments and reports become part of one structured, searchable system.

What we build

Custom software modules for real production and construction workflows.

Each solution is built around the company process: roles, statuses, permissions, documents, deadlines, price logic, production stations and reports. The result is practical business software that people can actually use every day.

Project management dashboard illustration for multiple active projects
01Project control

Project management systems

Track customers, deadlines, work orders, departments, tasks, comments, approvals, documents, payments and project history from one organized dashboard.

Production tracking interface with workshop data and live statuses
02Workshop visibility

Production tracking

Connect planning, workstations, barcode scans, labels, task completion, capacity, delays and quality notes so the factory floor is no longer invisible.

Offer and drawing software interface for technical sales
03Technical sales

Offer and drawing tools

Create professional offers, product positions, drawings, material definitions, article lists, technical outputs and price calculations with fewer manual mistakes.

Procurement and warehouse workflow dashboard with material statuses
04Material flow

Procurement and warehouse

Follow suppliers, ordered goods, expected dates, received materials, stock movements, reservations and handover points between office and warehouse.

Analytics dashboard for reports, statistics and management insight
05Management insight

Reports and analytics

Generate financial cards, supplier statistics, productivity overviews, delay analysis, delivery performance, exports and management reports without rebuilding data manually.

Connected modules and automation pipeline for custom software integrations
06Connected systems

Custom integrations

Add scanner workflows, thermal label printing, mobile views, supplier portals, customer portals, imports, exports and secure role-based modules around existing work.

ULTI Planner

Project management software for the whole operational chain.

ULTI Planner is a web-based workflow system for project-driven companies. It connects sales, technical preparation, procurement, warehouse, planning, production, delivery, invoicing, payment tracking, reporting, management and customer access into one practical application.

The system is useful for companies that handle many active projects at once and need to know what is waiting, what is late, who owns the next step, which material is expected, which customer has open debt and which department needs attention.

  • ✓
    Dashboard and active project overview. KPI cards, project lists, timelines, notifications, delay warnings and quick access to daily tasks.
  • ✓
    Role-based modules. Sales, technical preparation, procurement, warehouse, planning, production, delivery, invoices, payments, manager view, customer portal and read-only users.
  • ✓
    Workflow by department. Every sector updates its own part of the project while management sees the complete operational picture.
  • ✓
    Reports and business insight. Supplier delivery statistics, productivity analytics, financial cards, delay analysis, exports and searchable project history.
Pricing packagesULTI Planner
Permanent / enterprise

From €2,500

One-time enterprise licence for companies that want a permanent installation and long-term ownership.

Additional changes and custom reports may induce extra cost.

project workflow softwareproduction planningprocurement trackingdelivery statuscustomer portalbusiness reports
Dark project dashboard environment for ULTI Planner Abstract ULTI Planner dashboard layout with status cards, timeline and mobile overview

ULTI Designer

Offer, drawing and material calculation software for configurable products.

ULTI Designer helps technical sales and engineering teams create structured offers and drawn positions for windows, doors, sliding doors, facade elements and other products where dimensions, systems, openings, glass, panels, accessories and price rules matter.

The workflow starts with a project dashboard, continues with positions and product definitions, and then moves into the drawing module where users can split fields, edit elements, select opening types, apply glass packages, define panels, add hardware, use low thresholds, extensions, roller shutters and special shapes such as arches, slopes and round windows.

  • ✓
    Project and offer structure. Users can create projects, open existing offers, duplicate, rename, edit and print professional documents.
  • ✓
    Visual drawing workflow. Field splitters, field editor, inside-outside view, selected sides, mullions, sashes, frames and dimension editing support fast configuration.
  • ✓
    Material and article logic. Profile systems, glass units, panels, hardware options, extensions, additional articles and production-relevant selections stay connected to the position.
  • ✓
    Price calculation support. Automatic price calculation can be used for standard work, while authorized users can switch to manual pricing when a special case requires it.
Pricing packagesULTI Designer
Permanent / enterprise

From €9,500

One-time enterprise licence with unlimited users for larger sales networks and production environments.

Extra modules, systems and functions can induce extra cost.

window softwaredoor offer softwarefacade drawing toolmaterial calculationtechnical salesprice calculation
Dark technical drawing software environment for ULTI Designer Abstract ULTI Designer drawing interface with window element layout and side controls

Custom solutions

When generic software does not match the way your company works.

Many technical companies use a mix of spreadsheets, ERP exports, messaging apps, manual labels, old databases and paper notes. A custom system can connect only the parts that matter: a dashboard for managers, a simple mobile view for installers, a barcode scan for a workstation, a supplier overview for procurement or a report that would otherwise take hours to prepare.

Custom development is especially powerful when the workflow is specific: window and facade production, order preparation, warehouse receiving, label printing, project handover, installation service, production quality checks or company-specific price logic.

  • ✓
    Production integrations. Barcode scanners, thermal label printers, workstation screens and task completion flows.
  • ✓
    Admin and access control. Users see the modules, data and actions that match their role, department or customer account.
  • ✓
    Reports that match management questions. Instead of generic graphs, the software can show the numbers that actually drive decisions.
  • ✓
    Fast practical deployment. Start with one painful process, prove value, then expand with new modules when the team is ready.
custom web appbarcode workflowlabel printingmobile dashboardsupplier portalfactory automation
Custom software modules connected across devices Abstract custom workflow system with connected modules around a central platform

Business value

Four outcomes every operational system should create.

Efficiency illustration with accelerated workflowEfficiency

Reduce repeated entry, status chasing and manual document work. Users move through focused screens instead of searching through disconnected files.

Effectiveness illustration with target and check markEffectiveness

Help teams choose the right next action. Planning, procurement, production and sales work with better priorities and fewer wrong assumptions.

Clarity illustration with clean dashboard rowsClarity

Turn messy operational information into clean status cards, filtered lists, timeline views, comments, searchable history and readable reports.

Control illustration with shield and approval symbolControl

Use permissions, roles, audit history and structured modules so each user can act only where they should, while management keeps oversight.

Best-fit industries

Made for companies where physical work and digital information must meet.

Ultimatik Network is strongest where a project goes through many hands: sales, engineering, purchasing, warehouse, workshop, delivery, installation, service and management.

Window, door and facade producer illustration
Industry

Window, door and facade producers

Offers, drawings, profile systems, glass, panels, roller shutters, materials, production flow, delivery and installation tracking.

Construction company illustration with building site
Industry

Construction companies

Project phases, customers, subcontractors, supplier dates, costs, documentation, deadlines and management reporting.

Production workshop illustration with workstation line
Industry

Production workshops

Work orders, workstations, barcode labels, quality notes, planned capacity, completed operations and daily production overview.

Installer and service team illustration with mobile status
Industry

Installers and service teams

Mobile access, delivery schedules, field status, service tasks, photos, notes and customer communication from one controlled place.

Cooperation process

A practical path from problem to working system.

1

Map the process

We define departments, roles, statuses, documents, reports, bottlenecks and the real order of work.

2

Build the core

The first version focuses on the area with the biggest time loss or visibility problem.

3

Connect the workflow

Tasks, dashboards, scanners, labels, mobile views, imports and exports are added where they help.

4

Improve with usage

After real users start working, reports and feedback show what should be optimized next.

Contact

Tell us what should become easier to see, plan or control.

Send a short description of your company, your current workflow and the operational problem that costs the most time. You can ask about ULTI Planner, ULTI Designer or a custom module for your own process.